Studio Control Room

A dashboard that ran a nine-person design studio

A dashboard, timeline, 3D viewer and stress-test game for a ten-week building project.

The Building Control Room dashboard with a 3D building model and project data panels.

Santiago, Chile, has an air problem. Polluted air gets trapped in the valley between the Andes and the coastal range. The city regularly exceeds WHO thresholds for PM2.5, and for its 7 million residents, “going outside” is sometimes a health calculation.

So when our MACAD 2026 studio asked us to design a hyperbuilding for this context, we started from a question: what if the architecture itself could breathe?

That question became HB01 : The Lungs: three towers reaching 400m, 500m, and 600m, spanning 210 floors and over one million square metres of built area. The building doesn’t just house people – it filters 12,000,000 m³ of air per year, the equivalent of 4,800 mature trees. Dirty air enters through a porous Voronoi-void facade, passes through the spatial body of the building, and exits clean. The structure is the bronchioles. The program is the lungs. The data is the nervous system.

This page covers the nervous system, which our Data team built.

Three Teams, One Respiratory System

The studio was structured around three colour-coded specialist teams, each responsible for one dimension of the hyperbuilding. The Structure team (green) designed the engineering systems and the Voronoi-void facade – the bronchioles through which air moves. The Program team (blue) shaped the floor plates, circulation cores, bridges, and spatial programme – the lungs themselves. And then there was us: the Data team (red).

Our deliverable wasn’t a part of the building. It was the platform that held the entire studio together — the analytics, the performance tracking, the sensing and feedback layer. While Structure and Program designed the organism, we built its nervous system: a custom web application to run, track, and document the 10-week studio process in real time.

The nine of us realised early in the ten weeks that spreadsheets and Slack threads couldn’t handle the coordination between teams, so we built our own platform.

Why We Built a Platform Alongside the Building

Most studio documentation happens after the fact. You finish the project, you make a website, you archive the files. We wanted to try something different: build the tool at the same time as the building, so it could actually shape how all three teams worked – not just record what they did.

The result is a custom web application built in Vue 3 with Vite, styled with Tailwind CSS, backed by a database, and authenticated via Google OAuth. It serves simultaneously as a project dashboard, a performance tracker, a 3D model viewer, a public showcase, and – improbably – a team engagement monitor. All built around the same visual language as the architectural concept: the green/blue/red colour system, the morphing blob shapes, the respiratory metaphor.

Four Features That Changed How We Worked

01 | KPI Dashboard & KPI Map – Making Performance Visible

Every design studio tracks metrics, but usually in a spreadsheet that gets updated once a week and rarely checked. We wanted KPIs you could read at a glance, that showed whether the project was hitting its targets.

The KPI Dashboard shows each metric as a card: current value, target, on/off status, trend direction, and a sparkline. Click to expand and you get the formula and a description of what the number actually means. A radar chart overlays all three teams’ scores simultaneously, so anyone in the studio can see at a glance where the building is performing and where it’s slipping -embodied carbon at 342 kgCO₂e/m² against a target of 400, structural efficiency at 92% against 85%, daylight factor at 4.2% against 3%. The KPIs are shared across teams: some belong to Structure, some to Program, some to Data, and many sit at the intersection.

The KPI Map shows how the KPIs affect each other across teams, as a force-directed dependency graph. Change a structural grid dimension and watch the node for daylight factor pull closer, which tugs energy intensity along with it. It makes the invisible visible – the fact that no design decision exists in isolation. You can filter by team, toggle display modes, and in edit mode, draw new connections as the project evolves. For us as the Data team, this was the tool that turned “we should probably coordinate” into “look at the graph – we have to coordinate.”

02 | Timeline – Lines That Breathe Together

A Gantt chart tells you when things are due. Our timeline tells you how teams relate to each other over time. Three animated polyline tracks, one per team, run across a 10-week span from January to March 2026. But here’s the twist: the tracks don’t stay parallel. They converge or diverge based on the cross-team connection strength of the milestones sitting on them.

When Structure and Data have tightly linked deliverables in a given week, their lines physically pull toward each other on screen. When teams are working independently, the tracks drift apart. It’s a spatial encoding of collaboration intensity, and it turned out to be one of the most useful planning tools we had, because it made misalignment obvious before it became a problem. We built it to keep all three teams on track and make their interactions legible. Milestones are stored in the database and the timeline can be exported as SVG or PNG for presentations.

03 | Stress Test – Gamifying the Question Nobody Asks

This is probably the feature people remember. In a 30-second mini-game, team members pop animated blobs on screen as fast as they can. Your score converts into a health percentage that immediately updates your avatar’s health bar on the main dashboard. A leaderboard ranks everyone by “calmness” – the inverse of stress – and personal bests are tracked over time.

We introduced the Stress Test partly to track app engagement – if people are playing, they’re using the platform – and partly because studio culture in architecture schools tends to glorify burnout. We wanted a low-friction, recurring signal that makes team health a visible metric, not a conversation you have once during crunch week. The blobs are the same morphing shapes used for member avatars across the app, tying the visual identity together.

04 | 3D Model Viewer – Performance on the Geometry

The app embeds a 3D viewer showing the live HB01 model, so team members can inspect the building without having to open a separate tool. But it goes beyond just spinning a model in the browser. A gradient visualisation layer lets you map parametric data — structural loads, thermal performance, ventilation rates — directly onto the geometry as colour gradients, turning abstract numbers into spatial intuition.

A timeline scrubber lets you jump between saved model snapshots to track design evolution across the 10-week studio. It’s version control for architecture — not just “what does it look like now” but “how did we get here.” For the Structure and Program teams especially, having a filtered view embedded directly in the studio platform meant one less context switch in an already overloaded workflow.

The Full Picture

Beyond these four features, the app includes a public-facing tower page with scroll-based storytelling, an internal dashboard summarising milestones and team health, and a database-driven guided tour system powered by driver.js. Every module was designed and built by the Data team, serving data that flows from all three teams. Here’s how the eight modules connect:

What We Learned

Building a platform alongside the project it supports is messy. The app’s scope kept expanding because the studio’s needs kept expanding. A KPI card that seemed fine in week 2 needed formula breakdowns by week 5. The timeline started as a static visualisation and became a database-driven, exportable planning tool. The Stress Test was a late addition that became the studio’s favourite feature.

First, shared visual language matters more than shared tools. The fact that the app uses the same green/blue/red system, the same blob morphology, and the same respiratory metaphor as the architectural concept meant that every screen felt like part of the project, not an admin layer on top of it. When three teams are working semi-independently, aesthetic coherence creates cognitive coherence.

Second, making dependencies visible changes behaviour. Before the KPI Map existed, cross-team consequences were discussed in meetings and then forgotten. Once they were rendered as a force-directed graph that anyone could open at any time, teams started designing with downstream effects in mind. Visibility is a form of accountability.

Third, engagement is a design variable, not a side note. The Stress Test started as a playful experiment and ended up being one of the most honest metrics on the dashboard. When someone’s health bar drops, it’s visible. When app usage dips, we know. It created a culture where checking in on each other wasn’t awkward – it was just reading the dashboard.

What This Means for Studio Culture

Architecture studios generate enormous amounts of data, coordination overhead, and human stress. Most of that is managed with tools built for other industries – project management software that doesn’t understand design iteration, communication platforms that don’t encode team structure, dashboards that track deliverables but not people.

What we built for HB01 isn’t a product. It’s a proof of concept: that a design team can use computation not only to make the building but to operate the studio process itself. That the tool and the project can share a language. That performance dashboards and blob-popping games can coexist on the same platform, and both make the work better.

The building breathes. So does the app.

Project: HB01 — The Lungs | MACAD 2026 Module 2 | IAAC Barcelona

Web App:bimscstudiohb1-production.up.railway.app/tower

Tech Stack: Vue 3 + Vite + Tailwind CSS + Speckle + driver.js + Google OAuth

Teams: Structure (Green): C. Abi Chahine, R. Ayoub, H. Karime | Program (Blue): G. Ramón García Ayala, A. Baltaji, M. Mohamed | Data (Red): E. El Chidiac, M. Sánchez Domínguez, L. Mari Zaro

Modelling and documentation

In the MaCAD Studio Seminar, our group worked as the Data Team for Hyperbuilding 01, one of three interconnected megastructures designed for Santiago de Chile, which together work as a single, cohesive vertical machine.

Hyperbuilding 01 operates as both lung and skin for the urban environment. In response to Santiago’s severe air pollution, the building is conceived as a large environmental regulator — a megastructure designed to filter air and water while supporting programmatic spaces within it.

The building is organized around central structural cores, from which programmatic boxes attach through a nodal bar system. Within this framework, different teams developed the structural logic, façade systems, and programmatic organization. The data team worked across these groups, ensuring that their design decisions could be translated into consistent, readable, and usable information.

The Role of the Data Team

Unlike other teams in the studio, the data team does not generate architectural geometry. Instead, we function as a coordination layer, ensuring that the outputs of multiple teams remain aligned.

Our responsibilities focused on maintaining coherence across the project’s information structure. This included defining naming conventions for models and parameters, establishing how information would be structured and retrieved, translating design work into data that could be processed computationally, and documenting key decisions along the way.

In practice, this meant managing the timing and order of work across teams, ensuring that the information needed for each stage of the project was available and understandable to everyone involved.

Making Data Spatial

A central challenge emerged from the nature of the data team itself: if we do not produce geometry, how can our work be read spatially inside the architectural model?

To address this, we developed a system of parametric Revit families that translate key performance indicators into geometric representations. Rather than existing as abstract numbers, these metrics become visible elements within the model.

We designed three families, each representing a different performance category: Thermal Comfort, Acoustic Comfort, and Air Purification.

Family Structure

KPI 1 – Thermal Comfort Compliance Rate

Family A — Thermal Panel

The Thermal Comfort Compliance Rate (TCCR) evaluates how effectively the building maintains acceptable thermal conditions by balancing incident solar radiation, shading capacity, and internal energy loads.

To make this metric spatially legible, it is translated into Family A: the Thermal Panel. This parametric element maps incident radiation against shading factor, modifying its expression based on the envelope’s ability to mitigate climatic forces.

Within the model, these panels act as both data carriers and visual indicators, allowing thermal performance to be read directly across the building.

KPI 2 – Acoustic Comfort Noise Impact

Family B — Noise Orbit

The Acoustic Comfort Noise Impact Index measures the level of disturbance caused by the interaction between internal program noise and external environmental noise.

This KPI is represented through Family B: the Noise Orbit, a system of concentric geometries that encode both noise sources. The nested structure allows simultaneous visualization of individual values and overall acoustic impact.

As a result, acoustic performance becomes immediately readable, with lower index values corresponding to more comfortable environments.

KPI 3 – Air Purification Effectiveness

Family C — Pollutant Sphere

The Air Purification Effectiveness (APE) assesses the building’s capacity to filter polluted air by comparing external pollution levels with clean air output.

This relationship is spatialized through Family C: the Pollutant Sphere, which scales according to the difference between intake pollution and purified air. Larger spheres indicate higher purification demand.

Placed at critical points within the building, these elements make air quality performance visible, comparable, and spatially distributed.

Computational Workflow

To integrate these data-driven elements into the project, we developed an iterative workflow using Rhino.Inside Revit and Grasshopper.

The process begins with several key inputs: the parametric families developed by the data team, the shared Speckle model used by the studio for inspection and coordination, and a system of nomenclature defining how parameters and elements are named.

From Speckle, we extract the geometric and positional data of the building elements through Grasshopper. This information is then used to establish project levels and place the KPI families within the model using Rhino.Inside Revit.

Once the geometry is positioned, the next step is to assign the correct parameter values. These parameters, already defined as shared parameters within the model and families, are populated automatically using Rhino.Inside. This produces a second iteration of the model, now enriched with its informational layer.

With the data in place, we move on to documentation and visualization. Views and sheets are generated, and automated filters are created to display different KPI ranges. Using Grasshopper gradients, these filters are assigned graphical overrides that visually communicate performance levels.

At this stage, the model becomes both a design artifact and a data visualization tool, ready for export as Revit files, IFC models, or PDF documentation.

The Result

The final output is a conceptual 3D representation of the building in which geometry and data are tightly linked.

For the Thermal Comfort Compliance Rate, auxiliary box families are placed and color-coded according to the KPI formula. These elements read radiation and shading values from the panel families, making thermal behavior visible within the model.

For Acoustic Comfort, the Noise Orbit families populate each level of the project, both in the podium and tower. They display both internal program noise and the noise transmitted outside the building, with nested geometry allowing individual parameters and overall performance to be visualized simultaneously.

Finally, the Air Purification Effectiveness is represented through Pollutant Spheres placed at critical positions in the building. These spheres compare pollution intake with clean air output, visually highlighting areas where purification demand is highest.

Closing

Through this process, the data team helped transform the project into a data-driven architectural system, where environmental performance, spatial organization, and computational workflows operate together.

Rather than remaining abstract numbers in spreadsheets, the building’s performance indicators become visible components of the architectural model itself.

The live app

Images by the team.